国产精品97对对碰_欧美日韩国产中文字幕动漫_每日最新不卡av在线播放_精品激情丝袜美女亚洲_一区二区三区欧美日韩在线观看_影音先锋男人看片AV资源网_亚洲日本欧美夜夜恋剧场_国内精品成人在线观看_最新国产91视频视频_老熟妇乱子伦a级视频

Welcome to Western Power
Solution Expert | Stock code:002630
News | Industry information| Party building information| Announcements and Notices
The Hydro-test of 3# HPHT PC Boiler of 260T/h for Dongyin Gangcheng Project was Successful for One-time
2013-09-22

  On April 19, the hydro-test of 3# HPHT PC boiler for Dongyin Gangcheng project was conducted successfully for one-time, which was witnessed by CSEI, the owner, construction part and supervisors. The pressure increased to test pressure13.9MPa at 11:48 A.M, after 20 minutes hold, came down to design pressure 11.1MPa.Each technical index for 3# boiler met the design requirements after overall inspection. There aren’t any leakage and residual deformation happened on pressure parts and welding joints, which made a complete success.
 

?